Telstra Australia
Derwent River cable installation Macquarie Point to Bellerive Hobart Tasmania.
Laying of cable across Derwent River Macquarie Point to Bellerive
Diving Duties:
- Survey cable route for obstructions and seabed conditions.
- Mobilise cable lay barge and lay cable as required.
- Assist with hauling of cables through HDPE conduits.
- Install articulated pipe for 450m and survey cable to 15m of water depth.
Cable crew setting up for cable haul back through HDPE conduits Macquarie Point Hobart.

